Associate Director, Site Engineering – Data Center Construction

🕒 Setembro 17

🏄 California – Remoto

infoinfo

💵 $170.000 - $200.000 / ano

⏰ Tempo Integral

🟠 Sênior

🚰 Engenheiro de Dados

👻 Score fantasma 1%

infoinfo

🗣️🇺🇸🇬🇧 Inglês obrigatório

Candidatar-se
Encontrar Vagas Remotas Similares

📊 Verifique sua pontuação de currículo para esta vaga

Melhore suas chances de conseguir uma entrevista verificando sua pontuação de currículo antes de se candidatar.

Logo of Turner & Townsend

Turner & Townsend

10.000+ funcionários

🏗️ Construção

💼 Consultoria

🏠 Imobiliário

Construction • Consulting • Real Estate

Construímos confiança entre clientes, fornecedores, governos e a sociedade através do comprometimento, capacidade e cuidado que nossa equipe oferece. Entregamos resultados melhores que têm um impacto positivo no mundo ao nosso redor.

Descrição

• Manage and maintain the project RFI register • Review, triage, classify, draft, coordinate, and escalate RFIs through resolution • Monitor RFI status, due dates, turnaround times, and audit trails • Coordinate design deliverables, review cycles, and comment resolution across architectural, structural, mechanical, electrical, controls, and specialty disciplines • Track design risks, open issues, and action items • Facilitate design coordination meetings and manage agendas, documentation, and action items • Identify and communicate design process bottlenecks affecting project execution or construction • Maintain design basis documentation, RFI registers, submittal logs, design issue logs, and lessons learned databases • Promote collaboration among stakeholders, consultants, contractors, and client teams • Prepare regular program reports on RFI metrics, design status, issue resolution, and project risks • Analyze RFI trends and recurring issues to improve processes and design clarity • Support RFI management protocols, governance procedures, documentation standards, approval workflows, and authority boundaries • Adhere to applicable SOX control responsibilities

🎯 Requisitos

• Bachelor's degree in Engineering, Architecture, Construction Management, or a related technical discipline, or equivalent combination of education and experience • 8+ years of experience in project engineering, design management, construction administration, or technical project coordination on large capital projects • Experience supporting multidisciplinary design teams through design development, construction documentation, and construction phases • Strong knowledge of RFI, submittal, and design change management processes • Experience working within design-build, EPC, or traditional delivery models • Proficiency with project information management platforms such as Procore, Aconex, Autodesk Construction Cloud/BIM 360, or similar systems • Strong technical writing and documentation skills • Preferred: experience supporting data center, mission-critical, industrial, or large infrastructure projects • Preferred: familiarity with data center design fundamentals, including electrical distribution systems, mechanical cooling systems, building controls systems, and reliability and redundancy concepts • Preferred: experience operating within sophisticated program management and governance environments • Preferred: exposure to commissioning, design validation, or construction quality processes

🏖️ Benefícios

• Bonuses may be available • Comprehensive benefits package • Healthy, productive, and flexible working environment • Work-life balance support • Inclusive and diverse workplace • Opportunity to affect change • Equal opportunity employment

Candidatar-se