
51 - 200 employees
Manufacturing • Construction • HVAC
Mullins Mechanical is a company with extensive experience in the mechanical industry, specializing in a variety of services such as design-build applications, piping systems, HVAC, plumbing installations, boiler and chiller systems, equipment installation and rigging, metal fabrication, ASME code services, and fire protection. Their focus is on providing high-quality solutions for industrial, chemical, utility manufacturing, automotive distribution, and food and beverage sectors. With a commitment to client satisfaction and efficient project execution, Mullins Mechanical prioritizes building long-term partnerships with their clients.
🕒 May 8
🌴 South Carolina, Tennessee, +1 more states – Remote
💵 $100k - $165k / year
⏰ Full Time
🟡 Mid-level
🟠 Senior
👔 Manager
Improve your chances of getting an interview by checking your resume score before you apply.

51 - 200 employees
Manufacturing • Construction • HVAC
Mullins Mechanical is a company with extensive experience in the mechanical industry, specializing in a variety of services such as design-build applications, piping systems, HVAC, plumbing installations, boiler and chiller systems, equipment installation and rigging, metal fabrication, ASME code services, and fire protection. Their focus is on providing high-quality solutions for industrial, chemical, utility manufacturing, automotive distribution, and food and beverage sectors. With a commitment to client satisfaction and efficient project execution, Mullins Mechanical prioritizes building long-term partnerships with their clients.
• Lead the development of detailed project schedules along with project teams’ input • Collect project progress and updating project status • Performing impact analysis for potential delays and changes • Work with the project management and field teams to help set project goals and analyze the status of the project • Analyze the schedules to determine duration and logic issues • Ability to manage schedules for multiple projects and/or more complex projects, larger in size • Provide guidance to less experienced members of the scheduling team • Perform other duties as assigned • Travel may be necessary depending on the project needs and location
• Bachelors degree in Construction Management, Engineering, or related field is preferred • Minimum 3 years of experience in complex construction (Heavy Commercial, Data Centers, Industrial, Power Generation, Specialty Contractors, Heavy Civil) • Knowledge of critical path method of scheduling • Experience using CPM Primavera P6 scheduling software • Experience with ProCore, Bluebeam, Navisworks, REVIT preferred • Familiarity with claims prevention and analysis techniques strongly preferred • Ability to conduct constructability reviews for varying construction method/techniques during design or construction
Apply Now🕒 May 8
Manager, Talent Strategy at The Home Depot focusing on attracting niche talent and developing recruitment strategies. Collaborating with cross-functional teams to manage multiple initiatives and strategic planning.
🕒 May 8
Regional Safety Manager at Sunrun overseeing OSHA safety compliance and risk mitigation across a multi-state region. Leveraging AI to enhance safety strategies and drive a Goal Zero culture.
🇺🇸 United States – Remote
💵 $98.7k - $131.7k / year
⏰ Full Time
🟡 Mid-level
🟠 Senior
👔 Manager
🦅 H1B Visa Sponsor
🕒 May 8
Regional Safety Manager role at Sunrun responsible for OSHA safety compliance and risk mitigation across a multi-state region. Leverage AI tools to enhance safety strategies with a focus on employee well-being.
🇺🇸 United States – Remote
💵 $108.6k - $144.8k / year
⏰ Full Time
🟡 Mid-level
🟠 Senior
👔 Manager
🦅 H1B Visa Sponsor
🕒 May 8
10,000+ employees
District Manager responsible for leading retail store operations for Five Below in Arizona. Building a strong sales culture and developing high-performing teams to enhance customer experience.
🇺🇸 United States – Remote
💰 $194M Private Equity Round on 2010-10
⏰ Full Time
🟡 Mid-level
🟠 Senior
👔 Manager
🦅 H1B Visa Sponsor
🕒 May 8
10,000+ employees
District Manager overseeing store performance and customer experience at Five Below. Building a strong management team and driving retail sales in Washington region.
🇺🇸 United States – Remote
💵 $83.2k - $132.4k / year
💰 $194M Private Equity Round on 2010-10
⏰ Full Time
🟡 Mid-level
🟠 Senior
👔 Manager
🦅 H1B Visa Sponsor