Project Launch Manager – Data Center Construction

🕒 Agosto 21

🌶️ New Mexico – Remoto

infoinfo

💵 $140.000 - $160.000 / ano

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

👻 Score fantasma 1%

infoinfo

🗣️🇺🇸🇬🇧 Inglês obrigatório

Candidatar-se
Encontrar Vagas Remotas Similares

📊 Verifique sua pontuação de currículo para esta vaga

Melhore suas chances de conseguir uma entrevista verificando sua pontuação de currículo antes de se candidatar.

Logo of Turner & Townsend

Turner & Townsend

10.000+ funcionários

🏗️ Construção

💼 Consultoria

🏠 Imobiliário

Construction • Consulting • Real Estate

Construímos confiança entre clientes, fornecedores, governos e a sociedade através do comprometimento, capacidade e cuidado que nossa equipe oferece. Entregamos resultados melhores que têm um impacto positivo no mundo ao nosso redor.

Descrição

• Manage the transition of signed deals from lease execution through construction mobilization • Work with the pre-lease team to absorb and package each signed deal • Complete handover checks against client requirements and ensure transfer items are evidenced or logged as gaps with assigned owners and resolution dates • Prepare and co-lead onsite project launch meetings with the client project lead • Prepare launch materials and briefings • Assign and track resulting actions to completion • Commission schedule and cost reviews as design detail matures • Carry specialist findings into the site baseline and reporting • Pursue resulting actions with the developer • Drive open items inherited from due diligence to documented closure within the launch window • Lead the weekly project call, design coordination, and developer interface through mobilization • Maintain the action log and produce milestone reporting inputs • Manage day-to-day interfaces with the developer, client project lead, and internal specialists • Transfer each site to the onsite delivery team at mobilization, including the current baseline, open item register, and accepted-risk record • Contribute to the development of the team handover check, launch format, and reporting standard • Apply lessons learned to subsequent sites • Manage two to three concurrent sites at different stages • Adhere to applicable SOX control responsibilities • Travel approximately 6–10 days per month, including in-person launch meetings

🎯 Requisitos

• Minimum 5 years of relevant experience • Data center experience preferred in delivery, preconstruction, or development • Experience in mission critical facilities or complex technical buildings may be considered where transferable • Working knowledge of data center construction and the information and documentation required at construction mobilization • Experience with project handover, preconstruction coordination, change control, and open item tracking • Ability to interpret and act on schedule and cost reviews produced by specialists • Ability to pursue resulting issues with a developer • Ability to manage multiple concurrent projects at different stages • Ability to secure information and commitments from parties who do not report to the role • Ability to lead meetings with senior stakeholders and secure assigned actions with owners and dates • Ability to work to a developing standard and contribute to establishing it • Technical skills to read, understand, and communicate contract requirements, including construction drawings and specifications • Excellent written and verbal communication, including concise reporting to senior client stakeholders • Technological proficiency, including MS Suite and Google Workspace • Ability to understand and follow site HSSE policies • General technological proficiency • A degree is not required

🏖️ Benefícios

• Remote work options • Permanent position • Equal employment opportunity and affirmative action protections • Reasonable accommodation for individuals with disabilities • Consideration of qualified candidates with arrest or conviction records in accordance with LA County ordinance and CA law

Candidatar-se

Vagas Similares

🕒 Agosto 21

Verily

1001 - 5000

💼 Consultoria

🏥 Saúde

🤖 Inteligência Artificial

Solution Delivery Manager leading enterprise healthcare technology program delivery at Verily Health. Managing customer relationships, clinical trial budgets, compliance, and cross-functional execution.

🇺🇸 Estados Unidos – Remoto (EUA)

💵 $115.500 - $173.000 / ano

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

🦅 Patrocina Visto H1B

infoinfo

🗣️🇺🇸🇬🇧 Inglês obrigatório

🕒 Agosto 21

Biogen

5001 - 10000

🏥 Saúde

🏭 Manufatura

🧬 Biotecnologia

Biogen Family Access Manager supporting rare-disease patients through reimbursement and treatment-access barriers. Educating families and coordinating cross-functional patient support across the Austin–San Antonio territory.

🇺🇸 Estados Unidos – Remoto (EUA)

💵 $148.000 - $198.000 / ano

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

🦅 Patrocina Visto H1B

infoinfo

🗣️🇺🇸🇬🇧 Inglês obrigatório

🕒 Agosto 21

OneSource Virtual

501 - 1000

💼 Consultoria

🏥 Saúde

📦 Logística

Consulting Services Manager leading OneSource Virtual’s Workday consulting operations. Optimizing onboarding, project delivery, resource planning, and customer experience.

🇺🇸 Estados Unidos – Remoto (EUA)

💰 Series B em 2015-06

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

🦅 Patrocina Visto H1B

infoinfo

🗣️🇺🇸🇬🇧 Inglês obrigatório

🕒 Agosto 21

The Home Depot

10.000+ funcionários

🏗️ Construção

📦 Logística

🛒 Varejo

Field Support Manager conducting Home Depot store-racking inspections across NY/NJ Metro. Ensuring National Rack Standards compliance, training store leaders, and reviewing field trends.

🇺🇸 Estados Unidos – Remoto (EUA)

💵 $110.000 - $115.000 / ano

💰 Debt Financing em 2007-07

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

🗣️🇺🇸🇬🇧 Inglês obrigatório

🕒 Agosto 21

The Home Depot

10.000+ funcionários

🏗️ Construção

📦 Logística

🛒 Varejo

Field Support Manager inspecting Home Depot store racking and cantilever systems across nine Mid and South Atlantic locations. Ensuring National Rack Standards compliance through audits, training, and field-process feedback.

🇺🇸 Estados Unidos – Remoto (EUA)

💵 $110.000 - $115.000 / ano

💰 Debt Financing em 2007-07

⏰ Tempo Integral

🟡 Pleno

🟠 Sênior

👔 Gerente

🗣️🇺🇸🇬🇧 Inglês obrigatório