Electrical Project Manager, Commissioning – Data Center Construction Experience

🕒 February 10

🏢🏡 Indianapolis – Hybrid

⏰ Full Time

🟡 Mid-level

🟠 Senior

👷‍♀️ Project Manager

Apply Now
Find Similar Remote Jobs

📊 Check your resume score for this job

Improve your chances of getting an interview by checking your resume score before you apply.

Logo of InPwr Inc.

InPwr Inc.

WebsiteLinkedIn

201 - 500 employees

Founded 2005

🤝 B2B

⚡ Energy

B2B • Energy

InPwr Inc. is a nationally operating design-build electrical contracting firm specializing in large-scale commercial and industrial electrical systems. The company delivers end-to-end electrical engineering, power distribution, installation, service & maintenance, and rapid emergency response (RePwr) for projects including mission-critical facilities, multi-family dwellings, cold storage, and production sites. InPwr emphasizes rigorous safety training, on-site construction leadership, and a proprietary “Build It Better Approach™” to ensure projects are planned, executed, and maintained to high quality standards across the U. S.

📋 Description

• Project Planning: The Project Manager leads the development of the commissioning plan, which outlines the scope, schedule, resources, and procedures for commissioning the data center's infrastructure. This involves collaborating with stakeholders, including design engineers, construction teams, and facility operators. • Coordination: Coordinate commissioning activities with various project stakeholders to ensure alignment with project milestones and deadlines. This includes scheduling equipment installations, testing, and integration activities to minimize disruption to the project timeline. • Vendor Management: Liaises with equipment vendors and subcontractors involved in commissioning activities, ensuring that equipment is delivered on time, installed correctly, and tested according to specifications. • System Integration: Oversee the integration of various data center systems, including electrical, mechanical, fire suppression, security, and environmental monitoring systems. This involves testing interoperability, communication protocols, and failover mechanisms to ensure seamless operation. • Testing and Verification: Oversees the execution of functional and performance tests on critical infrastructure components, such as power distribution systems, cooling systems, UPS (Uninterruptible Power Supply) systems, generators, and data center management software. They ensure that systems meet design specifications and performance requirements. • Documentation: Maintain accurate records of commissioning activities, including test procedures, test results, equipment specifications, and as-built documentation. This documentation serves as a reference for future maintenance, troubleshooting, and expansion of the data center facility. • Risk Management: Identifies and mitigates risks associated with commissioning activities, such as equipment failures, system vulnerabilities, and operational disruptions. They develop contingency plans and escalation procedures to address unforeseen challenges. • Quality Assurance: Enforce quality standards throughout the commissioning process, ensuring that workmanship meets industry best practices and regulatory requirements. This includes conducting inspections, audits, and reviews to identify and rectify deficiencies. • Client Communication: Provides regular updates to the client or project stakeholders on the progress of commissioning activities, including milestones achieved, issues encountered, and resolution plans. They address client concerns and requests in a timely and professional manner. • Training and Handover: Facilitates training sessions for data center operations staff on the use and maintenance of critical infrastructure systems. Ensure a smooth handover of the facility to the client upon completion of commissioning activities, including documentation turnover and final acceptance procedures.

🎯 Requirements

• Bachelor or similar Master’s degree of Administrator (MBA) - optional • 3-5 years of experience in HV Substations, MV SWGR, LV SWGR, Busway, UPS, Generator, PDU, RPP, others • NFPA 70E • OSHA 10 • Complete all Safety Certifications • Daily Reports • Knowledge of CAD, Bluebeam, and others. • Ability to travel and work on site 75% required.

🏖️ Benefits

• Medical, Dental, Vision and Life Insurance 100% company paid for employees • Paid vacation & holidays • 401(k) company match • 30-day paid sabbatical every 5 years of employment • Stable employment with a growing company • Highly competitive salary

Apply Now

Similar Jobs

🕒 November 6, 2025

Louisville Paving and Construction Co.

201 - 500

WebsiteLinkedIn

Senior Project Manager managing construction projects, overseeing the project vision and execution in Indianapolis. Requires 8+ years of experience in similar contractor roles.

🕒 September 4, 2025

Arcadis

10,000+ employees

WebsiteLinkedIn

Water/Wastewater Project Manager leading and directing water, wastewater, and stormwater projects at Arcadis. Requires significant experience in project management and civil engineering.

🏢🏡 Indianapolis – Hybrid

💵 $95k - $160k / year

💰 $25k Grant on 2017-05

⏰ Full Time

🟠 Senior

🔴 Lead

👷‍♀️ Project Manager

🦅 H1B Visa Sponsor

info

🕒 June 27, 2025

United Consulting

51 - 200

WebsiteLinkedIn

Lead water and wastewater engineering projects, coordinating with clients and sub-consultants. Ensures compliance with contract specifications and deadlines.

🕒 June 27, 2025

United Consulting

51 - 200

WebsiteLinkedIn

Lead project development and oversee engineering tasks for bridge projects in Indianapolis.