Data Center Construction Electrical Estimator

πŸ”₯ 58 minutes ago

πŸ‡ΊπŸ‡Έ United States – Remote

⏰ Full Time

🟑 Mid-level

🟠 Senior

Where this job comes from

Posted on Worldwide Mission Critical's careers page β†—Worldwide Mission Critical's careers page, not through a job board

First seen by Remote Rocketship 58 minutes ago

Apply Now
Logo of Worldwide Mission Critical

Worldwide Mission Critical

11 - 50 employees

πŸ—οΈ Construction

πŸ’Ό Consulting

Construction β€’ Consulting

Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.

πŸ“‹ Description

β€’ Conduct regionally-specific market research on electrical systems, labor availability, commodity trends, equipment lead times, and other cost factors β€’ Maintain detailed records of historical project costs and analyze data for trends, patterns, and cost optimization opportunities β€’ Develop conceptual budgets and detailed estimates for electrical scope elements, including labor, materials, and equipment β€’ Generate cost variance reports at major design milestones β€’ Lead and support takeoffs using Bluebeam, On-Screen Takeoff, LiveCount, or similar tools β€’ Analyze subcontractor, vendor, and OEM pricing across electrical distribution, medium-voltage, generators, switchgear, UPS, site dry utilities, low-voltage/security, communications, and fire alarm scopes β€’ Collaborate with general contractors and trade partners to reconcile project costs and support change order forensics β€’ Conduct constructability reviews and identify design challenges and improvements across electrical-related scopes β€’ Work with project stakeholders on value-engineering solutions and evaluate alternative materials, methods, and technologies β€’ Contribute electrical scope requirements and specifications to RFP documentation β€’ Review and assist with GC-led buyout, bid leveling, trade-partner selection, pre-bid RFIs, site walks, post-bid interviews, and negotiations on the owner's behalf β€’ Travel occasionally to project sites for kick-offs, pre-bid walks, and constructability reviews

🎯 Requirements

β€’ 5+ years of estimating experience with a strong emphasis on electrical, medium-voltage, low-voltage, communications, and fire alarm scopes in mission-critical, data center, or other heavy industrial projects β€’ Proven ability to estimate projects $50M+ in total electrical contract value β€’ Ability to perform quantity takeoffs for electrical distribution and conduit/feeders, equipment (generators and switchgear, UPS, etc), medium-voltage distribution, site dry utilities, structured cabling/low-voltage, communications, and fire alarm systems β€’ Proficiency with estimating software (Accubid, or similar) and Microsoft Excel β€’ Solid understanding of data center-specific electrical challenges, including critical power topologies, redundancy concepts, and the ability to read and interpret electrical drawings, single-line diagrams, and specifications β€’ Familiarity with electrical equipment lead times and procurement strategy for long-lead items such as generators, switchgear, transformers, UPS systems, and medium-voltage gear β€’ Ability to work independently in a fast-paced environment while collaborating with the estimating team β€’ Bachelor’s degree in Construction Management, or a related field, or equivalent estimating experience in lieu of a degree

πŸ–οΈ Benefits

β€’ Support, trust, and room to grow β€’ Occasional travel to project sites for kick-offs, pre-bid walks, and constructability reviews

Apply Now

πŸ“Š Check your resume score for this job

Improve your chances of getting an interview by checking your resume score before you apply.

Similar Jobs

πŸ•’ 2 days ago

Ascension

10,000+ employees

πŸ₯ Healthcare

βš•οΈ Healthcare Insurance

🀝 Non-profit

Senior Construction Estimator leading full-cycle cost estimating for Ascension, a nonprofit Catholic healthcare system. Handling takeoffs, pricing, bid evaluation, and subcontractor negotiation.

πŸ‡ΊπŸ‡Έ United States – Remote

πŸ’΅ $83.1k - $115.8k / year

⏰ Full Time

🟠 Senior

πŸ”΄ Lead

πŸ•’ 5 days ago

Kimmel & Associates

51 - 200

πŸ“¦ Logistics

🏭 Manufacturing

πŸ“£ Marketing

Senior Estimator leading bundled drywall, ceiling, and painting bids for a growing Carolinas specialty contractor. Building contractor relationships, managing pipelines, and protecting gross margins.

πŸ‡ΊπŸ‡Έ United States – Remote

πŸ’΅ $120k - $150k / year

⏰ Full Time

🟠 Senior

πŸ•’ 5 days ago

AlphaHire

11 - 50

πŸ—οΈ Construction

πŸ’Ό Consulting

πŸ“¦ Logistics

Construction Estimator developing bids, takeoffs, and cost estimates for commercial and industrial Insulated Metal Panel projects. Supporting advanced manufacturing, mission-critical, and industrial construction markets.

πŸ‡ΊπŸ‡Έ United States – Remote

πŸ’΅ $75k - $105k / year

⏰ Full Time

🟑 Mid-level

πŸ•’ 5 days ago

AlphaHire

11 - 50

πŸ—οΈ Construction

πŸ’Ό Consulting

πŸ“¦ Logistics

Construction Estimator producing IMP system bids for a specialty building envelope contractor. Reviewing drawings, performing takeoffs, and developing commercial and industrial project estimates.

πŸ‡ΊπŸ‡Έ United States – Remote

πŸ’΅ $75k - $105k / year

⏰ Full Time

🟑 Mid-level

πŸ•’ 5 days ago

AlphaHire

11 - 50

πŸ—οΈ Construction

πŸ’Ό Consulting

πŸ“¦ Logistics

Construction Estimator developing bids and cost estimates for commercial and industrial Insulated Metal Panel projects. Supporting advanced manufacturing, mission-critical, and industrial construction markets.

πŸ‡ΊπŸ‡Έ United States – Remote

πŸ’΅ $75k - $105k / year

⏰ Full Time

🟑 Mid-level

Developed byΒ Lior Neu-ner. I'd love to hear your feedback β€” Get in touch via DM or support@remoterocketship.com
Follow Remote Rocketship on LinkedInFollow Remote Rocketship on InstagramFollow Remote Rocketship on FacebookFollow Remote Rocketship on TikTok