Site Engineering & Design Manager – Data Center Construction

🕒 September 17

🇺🇸 United States – Remote

💵 $140k - $180k / year

⏰ Full Time

🟡 Mid-level

🟠 Senior

🎨 Product Designer (UI/UX)

Where this job comes from

Posted on Turner & Townsend's careers page ↗Turner & Townsend's careers page, not through a job board

First seen by Remote Rocketship September 17

Still open on Turner & Townsend's site. Checked 5 hours ago.

Apply Now
Logo of Turner & Townsend

Turner & Townsend

10,000+ employees

🏗️ Construction

💼 Consulting

🏠 Real Estate

Construction • Consulting • Real Estate

Turner & Townsend is a global consultancy business that serves clients in the real estate, infrastructure, and natural resources sectors. With a commitment to building trust between clients, suppliers, governments, and society, they focus on delivering better outcomes that positively impact the world. Their specialities include programme strategy and setup, programme management, cost and commercial management, project management, procurement, safety, health and quality, controls and performance, technology and data, and advisory services. With 75 years of experience, Turner & Townsend aims to transform performance for a greener, more inclusive, and productive world.

📋 Description

• Manage and maintain the project RFI register through resolution • Review, triage, classify, draft, coordinate approval, and escalate RFIs • Monitor RFI status, due dates, turnaround times, and audit trails • Coordinate multidisciplinary design deliverables, review cycles, and comment resolution • Track design risks, open issues, and action items • Facilitate design coordination meetings and manage agendas, documentation, and action items • Identify and communicate design process bottlenecks • Maintain design basis documentation, RFI registers, submittal logs, design issue logs, and lessons learned databases • Promote collaboration among stakeholders, consultants, contractors, and client teams • Prepare regular program reports on RFI metrics, design status, issue resolution, and project risks • Analyze RFI trends and recurring issues for process improvement • Support RFI management protocols and governance procedures • Ensure compliance with documentation standards, approval workflows, and authority boundaries • Adhere to applicable SOX control responsibilities

🎯 Requirements

• Bachelor's degree in Engineering, Architecture, Construction Management, or a related technical discipline, or equivalent combination of education and experience • 5+ years of experience in project engineering, design management, construction administration, or technical project coordination on large capital projects • Experience supporting multidisciplinary design teams through design development, construction documentation, and construction phases • Strong knowledge of RFI, submittal, and design change management processes • Experience with design-build, EPC, or traditional delivery models • Proficiency with Procore, Aconex, Autodesk Construction Cloud / BIM 360, or similar project collaboration systems • Strong technical writing and documentation skills • Preferred: experience supporting data center, mission-critical, industrial, or large infrastructure projects • Preferred: familiarity with data center design fundamentals, including electrical distribution systems, mechanical cooling systems, building controls systems, and reliability and redundancy concepts • Preferred: experience operating within sophisticated program management and governance environments • Preferred: exposure to commissioning, design validation, or construction quality processes

🏖️ Benefits

• Bonuses may be available • Comprehensive benefits package • Flexible working environment • Work-life balance support • Equal opportunity and inclusive workplace

Apply Now

📊 Check your resume score for this job

Improve your chances of getting an interview by checking your resume score before you apply.

Similar Jobs

🕒 September 16

Spark

51 - 200

🏥 Healthcare

📣 Marketing

🛡️ Insurance

Senior Product Designer simplifying complex Medicare data into actionable workflows for brokers and agency leaders. Designing internal tools and agency experiences at Spark’s healthcare technology platform.

🕒 September 16

Higharc

11 - 50

🏗️ Construction

💼 Consulting

🏠 Real Estate

Staff engineer leading Higharc’s browser-based 3D home design application. Architecting customer-ready workflows with React, TypeScript, Three.js, and AI-supported experiences.

🕒 September 15

Circle

501 - 1000

💳 Fintech

₿ Crypto

🌐 Web 3

Lead Product Designer owning complex end-to-end experiences across Circle’s fintech, payments, treasury, and blockchain products. Influencing product strategy and elevating design quality.

🕒 September 15

Tilt (formerly Empower)

201 - 500

💳 Fintech

👥 B2C

💸 Finance

Head of Product Design leading designers and research for Tilt’s mobile-first financial products. Shaping product strategy, design systems, and AI-enabled workflows for fairer credit access.

🕒 September 14

EULER

11 - 50

☁️ SaaS

🤝 B2B

🤖 Artificial Intelligence

Head of UX/UI leading EULER’s design team and hands-on product UX/UI. Shaping an AI-native PRM for partnership managers and channel partners.

Developed by Lior Neu-ner. I'd love to hear your feedback — Get in touch via DM or support@remoterocketship.com
Follow Remote Rocketship on LinkedInFollow Remote Rocketship on InstagramFollow Remote Rocketship on FacebookFollow Remote Rocketship on TikTok