Senior Electrical Design Engineer – Data Center Construction

🔥 21 hours ago

🇺🇸 United States – Remote

⏰ Full Time

🔴 Lead

🔋 Electrical Engineer

Flash

Where this job comes from

Posted on Worldwide Mission Critical's careers page ↗Worldwide Mission Critical's careers page, not through a job board

First seen by Remote Rocketship 21 hours ago

Still open on Worldwide Mission Critical's site. Checked 7 minutes ago.

Apply Now
Logo of Worldwide Mission Critical

Worldwide Mission Critical

11 - 50 employees

🏗️ Construction

💼 Consulting

Construction • Consulting

Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.

📋 Description

• Serve as the senior technical lead for electrical design on complex, large-scale data center and mission-critical infrastructure projects from concept through commissioning and final turnover • Lead and oversee a team of electrical engineers and designers, establishing design standards, reviewing deliverables, and fostering technical excellence • Act as the primary liaison between internal departments, engineers of record, external consultants, and contractors to resolve complex electrical design challenges • Oversee development, review, and quality control of electrical documentation, including one-line diagrams, load calculations, panel schedules, arc flash studies, short circuit analyses, submittals, and RFIs • Lead evaluation and integration of emerging technologies for efficient, reliable, and scalable data center electrical infrastructure • Drive schedule and budget management by identifying design bottlenecks and evaluating cost impacts • Ensure compliance with NEC, IEEE, and IEC codes and standards • Lead risk assessments, factory acceptance testing, site acceptance testing, commissioning, milestone inspections, and system integration verification • Partner with mechanical, controls, and architectural disciplines to integrate electrical systems into broader project designs • Develop lessons-learned documentation and improve design processes, standards, and delivery methodologies • Provide field support during construction, conduct walkthroughs, resolve installation issues, and support handoff to operations • Contribute to internal design standards, templates, and electrical best practices

🎯 Requirements

• Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis • Minimum 10 years’ experience in the A/E industry with a strong focus on mission-critical and data center electrical infrastructure • Revit BIM design experience required; demonstrated ability to coordinate large-scale electrical systems within a BIM environment • Deep expertise in power distribution and lighting design, including medium voltage switchgear, transformers, UPS systems, generators, and associated controls • Proven proficiency in short circuit analysis and power system modeling using SKM, ETAP, or similar tools • Extensive background in the design, construction, testing, and commissioning of medium and low voltage electrical distribution systems, including power management and SCADA tools • Professional Engineering (PE) license required • Demonstrated experience with redundancy strategies (N, N+1, 2N) and fault-tolerant design principles for high-uptime data center environments • Strong understanding of substation design, switchgear, power monitoring, and associated commissioning processes • Comprehensive understanding of professional services from conceptual design through project close-out • Knowledge of sustainable design approaches including energy efficiency strategies and their application in large-scale infrastructure • Exceptional written and verbal communication skills with the ability to convey complex technical concepts to diverse audiences including senior leadership and external stakeholders • Passion for improving workflows and driving continuous improvement across the electrical discipline • Proficient with Microsoft Productivity Suite products

Apply Now

📊 Check your resume score for this job

Improve your chances of getting an interview by checking your resume score before you apply.

Similar Jobs

🔥 22 hours ago

Atlas Energy Solutions

1001 - 5000

⚡ Energy

📦 Logistics

🤝 B2B

Staff Electrical Engineer defining utility-grade power architectures, standards, and controls for Atlas Energy Solutions’ generation and microgrid systems. Leading complex studies, commissioning, and technical risk resolution.

🕒 Yesterday

Farnsworth Group, Inc.

501 - 1000

🏗️ Construction

💼 Consulting

🤝 B2B

Senior Electrical Engineering Lead scaling Farnsworth Group’s advanced manufacturing electrical services. Building teams, developing best practices, and overseeing complex client projects remotely.

🕒 Yesterday

HKA

501 - 1000

🏗️ Construction

⚖️ Legal

🛡️ Insurance

Forensic electrical engineering director investigating failures and disputes for HKA, a global risk mitigation and expert witness consultancy. Preparing reports and providing testimony.

🕒 4 days ago

Weekday (YC W21)

11 - 50

💼 Consulting

👥 HR Tech

☁️ SaaS

Electrical Engineer developing medical-device electronics, embedded systems, and PCBs. Managing testing, regulatory compliance, manufacturing support, and product lifecycle sustenance.

🕒 5 days ago

CRB

1001 - 5000

💼 Consulting

🍽️ Food & Beverage

🏥 Healthcare

Senior electrical engineer leading power-system design for CRB’s life sciences and food-and-beverage clients. Managing complex projects, technical teams, and construction support in regulated environments.

Flash

Developed by Lior Neu-ner. I'd love to hear your feedback — Get in touch via DM or support@remoterocketship.com
Follow Remote Rocketship on LinkedInFollow Remote Rocketship on InstagramFollow Remote Rocketship on FacebookFollow Remote Rocketship on TikTok