
11 - 50 employees
๐๏ธ Construction
๐ผ Consulting
Construction โข Consulting
Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.
๐ฅ 5 hours ago
๐บ๐ธ United States โ Remote
๐ต Estimated: $144k - $176k / year
โฐ Full Time
๐ก Mid-level
๐ Senior
๐ Electrical Engineer
๐ป Ghost score 14%
Where this job comes from
Posted on Worldwide Mission Critical's careers page โ, not through a job board
First seen by Remote Rocketship 5 hours ago
Still open on Worldwide Mission Critical's site. Checked 5 minutes ago.

11 - 50 employees
๐๏ธ Construction
๐ผ Consulting
Construction โข Consulting
Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.
โข Serve as a key liaison between internal departments, external consultants, contractors, and the Engineer of Record to troubleshoot and resolve electrical design challenges. โข Lead development and review of one-line diagrams, load calculations, panel schedules, submittals, technical studies, and RFIs. โข Research emerging trends and technologies to optimize electrical systems and data-center infrastructure. โข Ensure timely delivery of design packages by identifying bottlenecks and managing evolving requirements. โข Ensure electrical systems meet NEC, IEEE, and IEC codes and standards. โข Evaluate cost impacts of design changes, track electrical expenditures, and analyze EoR contractual obligations. โข Participate in risk assessment and commissioning, including factory and site acceptance testing, milestone inspections, and integration verification. โข Coordinate with mechanical, controls, and architectural teams to integrate electrical systems. โข Mentor and support junior engineers. โข Capture lessons learned and improve design processes, standards, and project outcomes. โข Support construction activities in the field, resolve installation issues, conduct walkthroughs, and ensure handoff to operations.
โข Bachelorโs degree in Electrical Engineering or Power Engineering with electrical building systems emphasis. โข Revit BIM design experience required. โข Proficiency in power distribution and lighting design, including controls implementation. โข Experience with short circuit analysis and analytical modeling software such as SKM or similar tools. โข Strong background in the design, construction, and commissioning of medium and low voltage electrical distribution systems, and power management or SCADA tools. โข Experience in mission-critical facilities and their electrical/mechanical infrastructure. โข Knowledge and experience in estimating, electrical design, operation, and commissioning of substations, switchgear, and power monitoring. โข Comprehensive understanding of professional services from conceptual design through project close-out. โข Strong written and verbal communication skills, organizational skills, and ability to motivate and mentor staff. โข Familiarity with sustainable design approaches and related project impacts. โข Passion for improving workflows and mentoring team members. โข Proficient with Microsoft Productivity Suite products.
Apply NowImprove your chances of getting an interview by checking your resume score before you apply.
๐ฅ 18 hours ago
Transmission line EIT designing and analyzing power delivery infrastructure for GAI. Preparing drawings, specifications, permits, and engineering studies using PLS-CADD and PLS-POLE.
๐บ๐ธ United States โ Remote
๐ฐ Private equity on 2022-11
โฐ Full Time
๐ข Junior
๐ก Mid-level
๐ Electrical Engineer
๐ฅ 18 hours ago
Senior Electrical Engineer designing Microsoft datacenter electrical and EPMS systems. Leading consultants, infrastructure projects, testing and commissioning for Microsoft cloud facilities.
๐บ๐ธ United States โ Remote
๐ต $119.8k - $234.7k / year
๐ฅ Funding within the last year
๐ฐ PRIVATE PLACEMENT VC on 2026-04
โฐ Full Time
๐ก Mid-level
๐ Senior
๐ Electrical Engineer
๐ 3 days ago
Remote Electrical Engineer designing and troubleshooting complex low- and medium-voltage distribution systems for a consulting firm. Leading projects, load studies, standards compliance, and junior staff mentorship.
๐ 3 days ago
Power Systems Engineer designing spacecraft power architectures, budgets, and verification plans for Lanteris Space missions. Coordinating subsystem teams, vendors, and spacecraft integration testing.
๐บ๐ธ United States โ Remote
๐ต $117k - $195k / year
๐ฅ Funding within the last year
๐ฐ Grant on 2026-06
โฐ Full Time
๐ก Mid-level
๐ Senior
๐ Electrical Engineer
๐ 3 days ago
Junior Project Manager supporting MEP/FP project delivery for faith-based AEC firm Above Group. Coordinating scope, schedules, budgets, quality control, clients, contractors, and design teams.
๐บ๐ธ United States โ Remote
๐ต $100k - $140k / year
โฐ Full Time
๐ก Mid-level
๐ Senior
๐ Electrical Engineer