
11 - 50 employees
ποΈ Construction
πΌ Consulting
Construction β’ Consulting
Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.
π₯ 21 hours ago
πΊπΈ United States β Remote
π΅ Estimated: $118k - $146k / year
β° Full Time
π‘ Mid-level
π Senior
β¨ Construction Estimator
π» Ghost score 20%
Where this job comes from
Posted on Worldwide Mission Critical's careers page β, not through a job board
First seen by Remote Rocketship 21 hours ago
Still open on Worldwide Mission Critical's site. Checked 2 hours ago.

11 - 50 employees
ποΈ Construction
πΌ Consulting
Construction β’ Consulting
Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.
β’ Conduct regionally-specific market research on electrical systems, labor availability, commodity trends, equipment lead times, and other cost factors β’ Maintain detailed records of historical project costs and analyze data for trends, patterns, and cost optimization opportunities β’ Develop conceptual budgets and detailed estimates for electrical scope elements, including labor, materials, and equipment β’ Generate cost variance reports at major design milestones β’ Lead and support takeoffs using Bluebeam, On-Screen Takeoff, LiveCount, or similar tools β’ Analyze subcontractor, vendor, and OEM pricing across electrical distribution, medium-voltage, generators, switchgear, UPS, site dry utilities, low-voltage/security, communications, and fire alarm scopes β’ Collaborate with general contractors and trade partners to reconcile project costs and support change order forensics β’ Conduct constructability reviews and identify design challenges and improvements across electrical-related scopes β’ Work with project stakeholders on value-engineering solutions and evaluate alternative materials, methods, and technologies β’ Contribute electrical scope requirements and specifications to RFP documentation β’ Review and assist with GC-led buyout, bid leveling, trade-partner selection, pre-bid RFIs, site walks, post-bid interviews, and negotiations on the owner's behalf β’ Travel occasionally to project sites for kick-offs, pre-bid walks, and constructability reviews
β’ 5+ years of estimating experience with a strong emphasis on electrical, medium-voltage, low-voltage, communications, and fire alarm scopes in mission-critical, data center, or other heavy industrial projects β’ Proven ability to estimate projects $50M+ in total electrical contract value β’ Ability to perform quantity takeoffs for electrical distribution and conduit/feeders, equipment (generators and switchgear, UPS, etc), medium-voltage distribution, site dry utilities, structured cabling/low-voltage, communications, and fire alarm systems β’ Proficiency with estimating software (Accubid, or similar) and Microsoft Excel β’ Solid understanding of data center-specific electrical challenges, including critical power topologies, redundancy concepts, and the ability to read and interpret electrical drawings, single-line diagrams, and specifications β’ Familiarity with electrical equipment lead times and procurement strategy for long-lead items such as generators, switchgear, transformers, UPS systems, and medium-voltage gear β’ Ability to work independently in a fast-paced environment while collaborating with the estimating team β’ Bachelorβs degree in Construction Management, or a related field, or equivalent estimating experience in lieu of a degree
β’ Support, trust, and room to grow β’ Occasional travel to project sites for kick-offs, pre-bid walks, and constructability reviews
Apply NowImprove your chances of getting an interview by checking your resume score before you apply.
π 3 days ago
Senior Construction Estimator leading full-cycle cost estimating for Ascension, a nonprofit Catholic healthcare system. Handling takeoffs, pricing, bid evaluation, and subcontractor negotiation.
πΊπΈ United States β Remote
π΅ $83.1k - $115.8k / year
β° Full Time
π Senior
π΄ Lead
β¨ Construction Estimator
π¦ H1B Visa Sponsor
π 6 days ago
Pre-Construction Estimator developing low-voltage installation cost models and subcontractor strategies. Supporting Johnson Controlsβ building systems and major projects teams.
πΊπΈ United States β Remote
π΅ $120k - $150k / year
β° Full Time
π‘ Mid-level
π Senior
β¨ Construction Estimator
π¦ H1B Visa Sponsor
π 6 days ago
Senior Estimator leading bundled drywall, ceiling, and painting bids for a growing Carolinas specialty contractor. Building contractor relationships, managing pipelines, and protecting gross margins.
πΊπΈ United States β Remote
π΅ $120k - $150k / year
β° Full Time
π Senior
β¨ Construction Estimator
π 6 days ago
Construction Estimator developing bids, takeoffs, and cost estimates for commercial and industrial Insulated Metal Panel projects. Supporting advanced manufacturing, mission-critical, and industrial construction markets.
πΊπΈ United States β Remote
π΅ $75k - $105k / year
β° Full Time
π‘ Mid-level
β¨ Construction Estimator
π 6 days ago
Construction Estimator developing bids and cost estimates for commercial and industrial Insulated Metal Panel projects. Supporting advanced manufacturing, mission-critical, and industrial construction markets.
πΊπΈ United States β Remote
π΅ $75k - $105k / year
β° Full Time
π‘ Mid-level
β¨ Construction Estimator