Data Center Construction Electrical Design Engineer

๐Ÿ”ฅ 2 hours ago

๐Ÿ‡บ๐Ÿ‡ธ United States โ€“ Remote

โฐ Full Time

๐ŸŸก Mid-level

๐ŸŸ  Senior

๐Ÿ”‹ Electrical Engineer

Where this job comes from

Posted on Worldwide Mission Critical's careers page โ†—Worldwide Mission Critical's careers page, not through a job board

First seen by Remote Rocketship 2 hours ago

Still open on Worldwide Mission Critical's site. Checked 50 minutes ago.

Apply Now
Logo of Worldwide Mission Critical

Worldwide Mission Critical

11 - 50 employees

๐Ÿ—๏ธ Construction

๐Ÿ’ผ Consulting

Construction โ€ข Consulting

Worldwide Mission Critical is a global owner's representation and project management company dedicated to the mission-critical industry, helping companies develop and deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, their ability to drive and manage all aspects of a project, from site selection through building turnover, sets them apart.

๐Ÿ“‹ Description

โ€ข Serve as a key liaison between internal departments, external consultants, contractors, and the Engineer of Record to troubleshoot and resolve electrical design challenges. โ€ข Lead development and review of one-line diagrams, load calculations, panel schedules, submittals, technical studies, and RFIs. โ€ข Research emerging trends and technologies to optimize electrical systems and data-center infrastructure. โ€ข Ensure timely delivery of design packages by identifying bottlenecks and managing evolving requirements. โ€ข Ensure electrical systems meet NEC, IEEE, and IEC codes and standards. โ€ข Evaluate cost impacts of design changes, track electrical expenditures, and analyze EoR contractual obligations. โ€ข Participate in risk assessment and commissioning, including factory and site acceptance testing, milestone inspections, and integration verification. โ€ข Coordinate with mechanical, controls, and architectural teams to integrate electrical systems. โ€ข Mentor and support junior engineers. โ€ข Capture lessons learned and improve design processes, standards, and project outcomes. โ€ข Support construction activities in the field, resolve installation issues, conduct walkthroughs, and ensure handoff to operations.

๐ŸŽฏ Requirements

โ€ข Bachelorโ€™s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis. โ€ข Revit BIM design experience required. โ€ข Proficiency in power distribution and lighting design, including controls implementation. โ€ข Experience with short circuit analysis and analytical modeling software such as SKM or similar tools. โ€ข Strong background in the design, construction, and commissioning of medium and low voltage electrical distribution systems, and power management or SCADA tools. โ€ข Experience in mission-critical facilities and their electrical/mechanical infrastructure. โ€ข Knowledge and experience in estimating, electrical design, operation, and commissioning of substations, switchgear, and power monitoring. โ€ข Comprehensive understanding of professional services from conceptual design through project close-out. โ€ข Strong written and verbal communication skills, organizational skills, and ability to motivate and mentor staff. โ€ข Familiarity with sustainable design approaches and related project impacts. โ€ข Passion for improving workflows and mentoring team members. โ€ข Proficient with Microsoft Productivity Suite products.

Apply Now

๐Ÿ“Š Check your resume score for this job

Improve your chances of getting an interview by checking your resume score before you apply.

Similar Jobs

๐Ÿ”ฅ 3 hours ago

GFT

5001 - 10000

๐Ÿ—๏ธ Construction

๐Ÿ’ผ Consulting

๐Ÿš— Transport

Transmission Line Engineer designing transmission infrastructure for GFT, a privately held AEC firm. Developing PLS-CADD designs, construction packages, feasibility studies, and client project solutions.

๐Ÿ‡บ๐Ÿ‡ธ United States โ€“ Remote

๐Ÿ’ต $90k - $125k / year

๐Ÿ’ฐ Debt Financing on 2023-03

โฐ Full Time

๐ŸŸก Mid-level

๐Ÿ”‹ Electrical Engineer

๐Ÿ”ฅ 14 hours ago

GAI Consultants, Inc.

501 - 1000

๐Ÿ’ผ Consulting

๐Ÿ“ฆ Logistics

๐Ÿญ Manufacturing

Transmission line EIT designing and analyzing power delivery infrastructure for GAI. Preparing drawings, specifications, permits, and engineering studies using PLS-CADD and PLS-POLE.

๐Ÿ”ฅ 15 hours ago

Microsoft

10,000+ employees

โ˜๏ธ SaaS

๐Ÿค– Artificial Intelligence

๐ŸŽฎ Gaming

Senior Electrical Engineer designing Microsoft datacenter electrical and EPMS systems. Leading consultants, infrastructure projects, testing and commissioning for Microsoft cloud facilities.

๐Ÿ‡บ๐Ÿ‡ธ United States โ€“ Remote

๐Ÿ’ต $119.8k - $234.7k / year

๐Ÿ”ฅ Funding within the last year

๐Ÿ’ฐ PRIVATE PLACEMENT VC on 2026-04

โฐ Full Time

๐ŸŸก Mid-level

๐ŸŸ  Senior

๐Ÿ”‹ Electrical Engineer

๐Ÿ•’ 3 days ago

Harrison Consulting Solutions

2 - 10

๐ŸŽฏ Recruiter

๐Ÿ’ผ Consulting

๐Ÿค B2B

Remote Electrical Engineer designing and troubleshooting complex low- and medium-voltage distribution systems for a consulting firm. Leading projects, load studies, standards compliance, and junior staff mentorship.

๐Ÿ•’ 3 days ago

Intuitive Machines

1001 - 5000

๐Ÿš€ Aerospace

Power Systems Engineer designing spacecraft power architectures, budgets, and verification plans for Lanteris Space missions. Coordinating subsystem teams, vendors, and spacecraft integration testing.

๐Ÿ‡บ๐Ÿ‡ธ United States โ€“ Remote

๐Ÿ’ต $117k - $195k / year

๐Ÿ”ฅ Funding within the last year

๐Ÿ’ฐ Grant on 2026-06

โฐ Full Time

๐ŸŸก Mid-level

๐ŸŸ  Senior

๐Ÿ”‹ Electrical Engineer

Developed byย Lior Neu-ner. I'd love to hear your feedback โ€” Get in touch via DM or support@remoterocketship.com
Follow Remote Rocketship on LinkedInFollow Remote Rocketship on InstagramFollow Remote Rocketship on FacebookFollow Remote Rocketship on TikTok