
11 - 50 employees
⚡ Energy
🔧 Hardware
☁️ SaaS
Energy • Hardware • SaaS
Poolside Infrastructure Company is an infrastructure developer and operator focused on building and operating the physical stack for large-scale AI (AGI) workloads. They develop a gigawatt-scale contiguous AI campus (Project Horizon) in West Texas with behind-the-meter natural gas generation, modular prefabricated AI-optimized buildings, integrated cooling and electrical systems, chip-agnostic compute deployment, and a software-defined cloud control plane that operates power, cooling and compute as one system. The company owns land (559 acres with a 12,000-acre expansion opportunity), designs prefabricated modular structures to accelerate commissioning, and aims to bring 200 MW online in the first building and 1. 2 GW across the campus from 2027, with potential for much larger power capacity over time. The team combines data-center development and software expertise to deliver a vertically integrated AI infrastructure stack.
Selected: 🇺🇸 United States – Remote USA.
Selected: 🆕 Date Added.
🕒 September 19
Director leading environmental health and safety for a data center campus. Building compliance programs, managing high-risk operations, and driving safety culture.
🕒 September 19
Design Director owning site planning, standards, consultants, and delivery for PIC’s remote power and water infrastructure campuses. Leading repeatable designs from raw land through construction.